When the weight of the flood clean-up and attention to issues
润之数控原创 [2007-10-9]

1, closed mechanical power, following the completion of the work, is no boot! !

2, substrate: substrate cleaning agent, contact the revival of small brushes - (recorded the location of contact or terminal), a serious, clean water and cleaning brush (available a small amount of neutral detergent), again with water-clean, and then immediately dry air spray gun to be sprayed dry and then dried up around 24 hours.

A use of "substrate cleaning agent" clean substrates.

B use "of the revival of contacts" to clean all joints and contacts.

3, pressure, relays, electromagnetic switch: high resistance table, tap revival of

A spray gun to clean up the air and water sludge; Fans again to be exact or hair dryer drying (60 ° C below).

B relays, electromagnetic switch tap directly be updated, if not they should buy one by one order of decomposition, cleaning, descaling, cleaning, mix, not all at once to avoid decomposition being mangled position causing greater problems; Decomposition not lost any attention at the Annex, wiring should make a record of Line code and the relative position.

C prior to the use of high resistance to the table coil impedance confirm whether there are short-circuit? (100 megohms above).
Boot test whether more attention should be paid to smoke or odor.
4, motor or hydraulic motors: high resistance table, and "pressed monkey" (Bearing out of )---- (recorded the location of contact or terminal)


A motor repair to the customers sent from the best motor repair shops, and the effects of human use will be better.

B air spray gun to clean up sludge and water. On both sides of the replacement motor bearings.

C fans or hair dryer to be exact drying. (60 ° C below) prior to the use of high resistance to the table coil impedance confirmed confirm whether there are short-circuit?

D boot test whether more attention should be paid to smoke or odor?

5, DC motors:

A Decomposition of Carbon Brush removed or covered, and behind ENCODER Carbon Brush, covered. Another air spray gun to clean up sludge and water.

B. ENCODER part of the same substrate cleaning.

C fans or hair dryer to be exact drying (60 ° C below).

D bending machine screw and guide: Other aircraft types and guide screw with this method.

6, regulation, D axis screw and guide: At the moment of their hands before and after moving to be exact cleaning, lubricating, so as not to 2,3 days rusty jam caused greater losses.

7, Bending Machine (M S / M) electromagnetic clutch and brake: heavy, clean water and cleaning brush (available a small amount of neutral detergent), again with water-clean, and then immediately dry air spray gun to be sprayed dry.

A to antirust oil (such as WD-40) its internal spraying to prevent rust bite.

B dried up again about 24 hours.

8, and even switch and the solenoid valve:

A away hoods, let drips and breathable, air spray gun to clean up mud and water.

B-linked part of moves to switch lubricants lubrication.

C 24 hours of their natural drying according to the original location to be loaded.

9, FANUC AC servo motors: Maintenance will be sent dismantled.

10, FANUC control substrate: the same substrate cleaning, attention to the machine itself "DATA SHEET" access and copying.

11, the substrate connector: air spray gun to clean up sludge and water, some of the joints should decomposition, dryer combinations later, after cleaning should be allowed under the joint vertical lines in order to facilitate a water droplet (especially the joints FAUNC controller).

12, the oil pressure: new oil filter and air bucket, PUMP, funnel

A quality check whether oil has been up muddy water or sludge? If should be replaced with new oil and filter.

B has no oil change more than a year are proposed to be replaced with new oil and filter.

13, mold and other transmission, such as iron I. moving part:

A sludge and air spray gun cleaning up water, then according to the provisions of lubricating oil or butter.

B lubrication and maintenance position should once again according to the manual maintenance.

14, San-lien Air Compressor Group (including Die automatic lubrication system): good clean-up after adding a new AT-32, in addition to water filters, cleaning, adjusting drip rate.

15, AT-32 recovery: When we complete these matters, then indeed be itemized recovery, before turning on and testing.